CONCERT HALL M2
The building was designed in 2004 and its construction was completed in 2010. Together with the former M1 building, it is the building complex of the Thessaloniki Concert Hall.
ACCESS
Χ1, 05, 06, 08, 30, 33: bus stop 25is Martiou
Photos: G. Simitopoulos
- Address 25is Martiou St. & waterfront
- Architect A. Isozaki, Schema 4 Architects
- Period 21TH CENTURY
- Type CULTURAL
- Area EAST
- Open House 2022, 2019, 2018, 2017, 2016, 2015, 2014, 2013, 2012